Pingguoyuan station


Contributors to Wikimedia projects

Article Images

For the station in Tongzhou District, Beijing, see Guoyuan station.

Pingguoyuan station[1] (simplified Chinese: 苹果园站; traditional Chinese: 蘋果園站; pinyin: Píngguǒyuán zhàn) is a station on Line 1, Line 6 and Line S1 of the Beijing Subway, located in Pingguoyuan Subdistrict, Shijingshan District, Beijing.

Pingguoyuan[1]

苹果园

Beijing Subway

Line 6 platform

Line S1 originating platform

General information
LocationPingguoyuan South Road (苹果园南路)
Pingguoyuan Subdistrict, Shijingshan District, Beijing
China
Coordinates39°55′36″N 116°10′39″E / 39.926727°N 116.177388°E
Operated byBeijing Mass Transit Railway Operation Corp., Ltd
Line(s)     Line 1 (under renovation)
     Line 6
     Line S1
Platforms6 (1 island platform and 2 side platforms, 2 side platforms under renovation)
Tracks6
Construction
Structure typeUnderground (Line 1 & Line 6)
Elevated (Line S1)
AccessibleYes
Other information
Statusin service (Lines 6 & S1)
Service suspended until 2025 (Line 1)[2]
Station code103 (Line 1)
History
OpenedApril 23, 1973; 51 years ago (Line 1)
December 31, 2021; 2 years ago[3] (Lines 6 and S1)
ClosedApril 18, 2020; 4 years ago (Line 1) (for renovation until 2025[2])
Services
Preceding station Beijing Subway Following station
Jin'anqiao

Terminus

Line 6 Yangzhuang

towards Lucheng

Jin'anqiao

towards Shichang

Line S1 Terminus

Location

Pingguoyuan[1] is located in Beijing

Pingguoyuan[1]

Pingguoyuan[1]

Location in Beijing

The station for Line 1 was opened on April 23, 1973. Pingguoyuan station on Line 1 is closed for renovation from April 18, 2020 to 2025.[2] The station for Line 6 and Line S1 was opened on December 31, 2021.

The Line 1 station and Line 6 station are underground, and the Line S1 station is elevated.

Platform panorama of Line 1 Pingguoyuan station.

The line 1 of Pingguoyuan station has two underground side platforms and both are the only two platforms of Beijing Subway stations that haven't installed platform gates due to the aging of platform devices.

The station for Line 1 is closed for renovation, and the platform gates will be installed after the renovation is finished.[4]

Line 6 has an underground island platform and Line S1 has 2 elevated side platforms.

There are 4 exits, lettered A, B, C, and D. All exits have a stairlift.[5] These exits are temporarily closed due to the renovation of Line 1.

There are 6 other exits, lettered E, F, G, H, I and J. Currently exits E, F, H, I and J are operational. Exits F and G are accessible via elevators, whilst exit H has a stairlift.

  • Station platform with exit stairs

  • Mezzanine

  • Street Level Station Hall

  • Platform middle

  • Line 6 concourse

  • Line S1 concourse

  1. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  2. ^ a b c "地铁1号线福寿岭站、苹果园站何时建成开通?". Archived from the original on 2022-03-19. Retrieved 2022-03-19. 且苹果园站是停运不停车,施工过程中还要确保地铁列车运行安全,所以施工进度有延迟。结构施工完成后还将进行机电设备、装修施工,预计在2023年底开通
  3. ^ "市重大项目办到苹果园交通枢纽现场办公". 2019-11-20.
  4. ^ "北京地铁1号线安全门全线投入使用". Beijing Municipal Commission of Transport. 2017-09-11. Archived from the original on 2017-09-12. Retrieved 2017-09-12.
  5. ^ 1号线. Beijing Subway 北京地铁官方网站 (in Chinese). Archived from the original on 2020-04-05. Retrieved 2020-10-21.